FESEM Facility is now available for users. Click here for more details.

Equipment Details Sort By:





AMAT Lab
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
1
AMAT - FEP Centura - DPN Chamber (Ch-A)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemscleanRahul Agrawal
Satish Kothimbire
Saurabh LodhaAMAT LabNot Working
2
AMAT - FEP Centura - Polygen Chamber (Ch-B)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemssemi clean aRahul Agrawal
Satish Kothimbire
Udayan GangulyAMAT LabNot Working
3
AMAT - FEP Centura - RTP Chamber (Ch-C)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemscleanRahul Agrawal
Satish Kothimbire
Saurabh LodhaAMAT LabNot Working
4
AMAT - PVD - Al2O3 (Ch-1)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemssemi clean aRahul Agrawal
Satish Kothimbire
Saurabh LodhaAMAT LabWorking
5
AMAT - PVD - TiN (Ch-D)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemssemi clean aRahul Agrawal
Satish Kothimbire
Saurabh LodhaAMAT LabWorking
6
AMAT - Ashing Chamber (Ch-D)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Reactive Ion Etchsemi clean bRahul Agrawal
Satish Kothimbire
Saurabh LodhaAMAT LabNot Working
7
AMAT - Etch Chamber (Ch-A)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Reactive Ion Etchsemi clean bRahul Agrawal
Satish Kothimbire
Saurabh LodhaAMAT LabPartially Working



Applied Quantum Mechanics Lab 1(NanoE bldg, 5th floor)
Pankaj Upadhyay
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
8
Temperature dependent Magneto Resistance Experimental Setup
Slot size :30 min.
activation time : 15 min.
period of inactivity :60 days
Electrical characterizationgold contaminatedShonal Chouksey
Pankaj Upadhyay
Dipankar SahaApplied Quantum Mechanics Lab 1(NanoE bldg, 5th floor)Working
9
Temperature Dependent Spectral Response Measurement system - PL set up
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationcleanPankaj Upadhyay
Shonal Chouksey
Dipankar SahaApplied Quantum Mechanics Lab 1(NanoE bldg, 5th floor)Not Working
10
Transient Absorption Pump Probe Spectrometer
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationcleanPankaj Upadhyay
Dipankar SahaApplied Quantum Mechanics Lab 1(NanoE bldg, 5th floor)Working



Applied Quantum Mechanics Lab 2(NanoE bldg, 5th floor)
Mudassar Meer
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
11
RF Cryogenic Device Characterization system
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Electrical characterizationgold contaminatedMudassar Meer
Akhil Kumar S
Dipankar SahaApplied Quantum Mechanics Lab 2(NanoE bldg, 5th floor)Working



Applied Quantum Mechanics Lab 3(NanoE bldg, 5th floor)
Kulasekaran Muniappan
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
12
Hall Measurement System
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Electrical characterizationlitho/analyticalDebi Prasad Panda
Subhananda ChakrabartiApplied Quantum Mechanics Lab 3(NanoE bldg, 5th floor)Working
13
Spectral Response-single pixel characterisation
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Electrical characterizationlitho/analyticalAkshay Balgarkashi
Hemant Ghadi
Subhananda ChakrabartiApplied Quantum Mechanics Lab 3(NanoE bldg, 5th floor)Working



Bio Sensors Lab (NanoE bldg, 7th floor)
Madhuri Vinchurkar, Rajul Patkar
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
14
Contact Angle Instrument (GBX)
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Material and structural characterizationgold contaminatedPankajkumar Gound
Madhuri Vinchurkar
Saurabh LodhaBio Sensors Lab (NanoE bldg, 7th floor)Working
15
Fluorescence Microscope (Z1)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationlitho/analyticalDilip Agarwal
Madhuri Vinchurkar
Swaroop GangulyBio Sensors Lab (NanoE bldg, 7th floor)Working
16
FTIR
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationlitho/analyticalKalyani Patrikar
Madhuri Vinchurkar
Subhananda ChakrabartiBio Sensors Lab (NanoE bldg, 7th floor)Working
17
UV-Vis-NIR Spectrometer - Lambda 750
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationlitho/analyticalAnkitha Bangera
Punam Murkute
Anil KottantharayilBio Sensors Lab (NanoE bldg, 7th floor)Working
18
Laser Engraving System (LES)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedBhuvaneshwari Karunakaran
Soumyo MukherjiBio Sensors Lab (NanoE bldg, 7th floor)Partially Working



BioMEMS Lab (Micro - 2)
Anjum Ahmed
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
19
2 inch general purpose anneal furnace
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemssemi cleanPoonam Jangid
Anil KottantharayilBioMEMS Lab (Micro - 2)Working
20
General purpose wet bench (BioMEMS lab)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Bonding toolsgold contaminatedNama Premsai
Swaroop GangulyBioMEMS Lab (Micro - 2)Working
21
Oven
Slot size :10 min.
activation time : 5 min.
period of inactivity :100 days
MiscellaneoustbdAnjum Ahmed
BioMEMS Lab (Micro - 2)Working
22
Silanization set up
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedDilip Agarwal
Anjum Ahmed
Anil KottantharayilBioMEMS Lab (Micro - 2)Working



Char Lab-2
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
23
Atomic Force Microscope (AFM)
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Material and structural characterizationin line actPoonam Jangid
Manisha Bansode
Dipankar SahaChar Lab-2Working
24
Integrated cryogen-free system - PPMS
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationcleanPragati Chaturvedi
Pankaj Upadhyay
Dipankar SahaChar Lab-2Working
25
Potentiostat
Slot size :30 min.
activation time : 10 min.
period of inactivity :90 days
Material and structural characterizationsemi clean bArif Ibrahim
Anjum Ahmed
Saurabh LodhaChar Lab-2Working
26
Wire Bonder
Slot size :30 min.
activation time : 15 min.
period of inactivity :180 days
Miscellaneousgold contaminatedSourabh Upadhyay
Subhananda ChakrabartiChar Lab-2Working



Clean lab -AMAT(NanoE bldg, 7th floor)
Pankajkumar Gound, Tapash Chakraborty
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
27
Olympus Microscope_AMAT CLEAN Lab
Slot size :15 min.
activation time : 5 min.
period of inactivity :300 days
Material and structural characterizationlitho/analyticalPankajkumar Gound
RangaRao Arnepalli
Saurabh LodhaClean lab -AMAT(NanoE bldg, 7th floor)Working
28
UV-Vis-Spectrometer - Lambda 25 (CLEAN Lab)
Slot size :15 min.
activation time : 5 min.
period of inactivity :100 days
Material and structural characterizationlitho/analyticalRangaRao Arnepalli
Pankajkumar Gound
Anil KottantharayilClean lab -AMAT(NanoE bldg, 7th floor)Working



Device Characterization Lab(DC)(NanoE bldg, 3rd Floor)
Sadaf Parwaiz, THIRUNAVUKKARASU A
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
29
Cygnus(Organic Device Characterization)
Slot size :30 min.
activation time : 15 min.
period of inactivity :700 days
Electrical characterizationlitho/analyticalSaikat Chakraborty
Sadaf Parwaiz
Device Characterization Lab(DC)(NanoE bldg, 3rd Floor)Working
30
Phoenix (Temperature Dependent IV/CV)
Slot size :30 min.
activation time : 15 min.
period of inactivity :700 days
Electrical characterizationlitho/analyticalSadaf Parwaiz
Souvik MahapatraDevice Characterization Lab(DC)(NanoE bldg, 3rd Floor)Working
31
Polaris (Stress/Long Time Measurements)
Slot size :30 min.
activation time : 15 min.
period of inactivity :700 days
Electrical characterizationlitho/analyticalJyothi K Naga Bhavya
THIRUNAVUKKARASU A
Souvik MahapatraDevice Characterization Lab(DC)(NanoE bldg, 3rd Floor)Working
32
Proxima (Fast IV Measurement/ B1500)
Slot size :30 min.
activation time : 15 min.
period of inactivity :700 days
Electrical characterizationin line actTHIRUNAVUKKARASU A
Sadaf Parwaiz
Souvik MahapatraDevice Characterization Lab(DC)(NanoE bldg, 3rd Floor)Working
33
RIGEL (Keysight B1500)
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Electrical characterizationin line actSadaf Parwaiz
Pankaj Kumbhare
Udayan GangulyDevice Characterization Lab(DC)(NanoE bldg, 3rd Floor)Working
34
Sirius (NBTI Setup)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Electrical characterizationlitho/analyticalSaikat Chakraborty
Souvik MahapatraDevice Characterization Lab(DC)(NanoE bldg, 3rd Floor)Working
35
Vega (Room Temperature IV/ CV)
Slot size :30 min.
activation time : 15 min.
period of inactivity :700 days
Electrical characterizationlitho/analyticalSadaf Parwaiz
Sayantan Ghosh
Souvik MahapatraDevice Characterization Lab(DC)(NanoE bldg, 3rd Floor)Working



EC Lab
Sharanya Sasidharan
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
36
Electro Plating system (Cu)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsgold contaminatedVishnu Kant Bajpai
Dipankar SahaEC LabWorking
37
Electroplating system - Au/Ni/Cu
Slot size :120 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemsgold contaminatedMinita Surwade
Sharanya Sasidharan
Dipankar SahaEC LabWorking
38
General Purpose Wet Bench (EC Lab)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Bonding toolsgold contaminatedPunam Murkute
Sharanya Sasidharan
Anil KottantharayilEC LabWorking
39
TMAH wet etch station
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Bonding toolsgold contaminatedJawaid Alam
Sharanya Sasidharan
Swaroop GangulyEC LabWorking
40
Cross section TEM sample preparation unit - Dimpler
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedNavneet Bhardwaj
Anil KottantharayilEC LabWorking
41
Cross section TEM sample preparation unit - Disc Cutter
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedNavneet Bhardwaj
Sharanya Sasidharan
Anil KottantharayilEC LabWorking
42
Cross section TEM sample preparation unit - PIPS
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedNavneet Bhardwaj
Punam Murkute
Anil KottantharayilEC LabWorking
43
Cross section TEM sample preparation unit - Ultrasonic Cutter
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedNavneet Bhardwaj
Sharanya Sasidharan
Anil KottantharayilEC LabWorking
44
EC Lab Hot air Oven
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
MiscellaneoustbdPunam Murkute
Sharanya Sasidharan
EC LabWorking
45
Spinner 2 Inch (PDMS)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedSharanya Sasidharan
Minita Surwade
Dipankar SahaEC LabWorking
46
Vapor generator for explosive detection
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedNikhilendu Tiwary
Gaurav Gupta
V Ramgopal RaoEC LabWorking



Micro1 Lab
Minita Surwade
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
47
2 inch Annealing Furnace (Gen purpose Forming gas/ Ar annealing furnace)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsgold contaminatedAmita Rawat
Anil KottantharayilMicro1 LabWorking
48
2 inch Boron_Solid source Diffusion Furnace
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemscleanBandana Singha
Anil KottantharayilMicro1 LabWorking
49
2 inch CMOS specific FGA furnace
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemssemi clean bKalaivani Srinivasan
Anil KottantharayilMicro1 LabWorking
50
2 inch Dry oxidation Furnace
Slot size :30 min.
activation time : 15 min.
period of inactivity :300 days
Deposition, Growth and Annealing systemscleanAnil KottantharayilMicro1 LabWorking
51
2 inch N2 Annealing Furnace
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemscleanAnil KottantharayilMicro1 LabWorking
52
2 inch Phosphorous_Solid source Diffusion Furnace
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemscleansuren patwardhan
Anil KottantharayilMicro1 LabPartially Working
53
2 inch Wet oxidation Furnace
Slot size :30 min.
activation time : 15 min.
period of inactivity :200 days
Deposition, Growth and Annealing systemscleanAmita Rawat
Anil KottantharayilMicro1 LabWorking
54
4 target E-beam evaporator
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsgold contaminatedNama Premsai
Dipankar SahaMicro1 LabPartially Working
55
Dielectric - sputter System
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsgold contaminatedNikhilendu Tiwary
Amita Rawat
Ashwin TulapurkarMicro1 LabWorking
56
Metal - sputter System
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsgold contaminatedSwasti Bhatia
Ashwin TulapurkarMicro1 LabWorking
57
Thermal Evaporator - Al
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsgold contaminatedSwapnil Bhuktare
Ashwin TulapurkarMicro1 LabWorking
58
Thermal Evaporator-Cr/Au
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsgold contaminatedVivek Surana
Ashwin TulapurkarMicro1 LabWorking
59
HRXRD
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationin line acKankat Ghosh
Apurba LahaMicro1 LabWorking
60
SEM EVO 18
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Material and structural characterizationlitho/analyticalGayatri Vaidya
Vishnu Kant Bajpai
Dipankar SahaMicro1 LabWorking
61
2 inch RCA Clean Station
Slot size :10 min.
activation time : 5 min.
period of inactivity :60 days
Bonding toolsclean (for si)Minita Surwade
Saurabh LodhaMicro1 LabWorking
62
4 inch RCA Clean Station
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Bonding toolsclean (for si)Minita Surwade
Saurabh LodhaMicro1 LabWorking
63
Chemical Mechanical Planarisation
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Bonding toolsgold contaminatedBhaskar Das
Udayan GangulyMicro1 LabWorking
64
General Purpose Wet Bench (Micro 1)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Bonding toolsgold contaminatedMinita Surwade
Saurabh LodhaMicro1 LabWorking
65
Tube Washer
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
MiscellaneouscleanMinita Surwade
Anil KottantharayilMicro1 LabWorking



Micro1 Yellow Room
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
66
Multi-pocket Electron-beam Evaporator (4 target - GaN)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsgold contaminatedYogendra Yadav
Mudassar Meer
Dipankar SahaMicro1 Yellow RoomWorking
67
STSRIE
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Reactive Ion Etchsemi clean aSreejith K P
Saurabh LodhaMicro1 Yellow RoomWorking
68
Karl Suss MJB3 Mask Aligner
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Lithographylitho/analyticalJayashree Ravindranathan
Saurabh LodhaMicro1 Yellow RoomWorking
69
Karl Suss MJB4 Mask Aligner
Slot size :30 min.
activation time : 10 min.
period of inactivity :100 days
Lithographylitho/analyticalHemant Kshirsagar
Jayashree Ravindranathan
Ashwin TulapurkarMicro1 Yellow RoomWorking
70
Laser Writer
Slot size :60 min.
activation time : 15 min.
period of inactivity :90 days
Lithographylitho/analyticalAkhil Kumar S
Dipankar SahaMicro1 Yellow RoomWorking
71
Spinner 2 inch (General Purpose)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Lithographylitho/analyticalJayashree Ravindranathan
Saurabh LodhaMicro1 Yellow RoomWorking
72
Spinner 2 inch (SU8, PPR)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Lithographylitho/analyticalJayashree Ravindranathan
Hemant Kshirsagar
Saurabh LodhaMicro1 Yellow RoomWorking
73
Barn-stead Lab-line Oven
Slot size :10 min.
activation time : 5 min.
period of inactivity :100 days
Miscellaneousgold contaminatedHitesh Kamble
V Ramgopal RaoMicro1 Yellow RoomWorking
74
Probe Sonicator
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedJayashree Ravindranathan
Saurabh LodhaMicro1 Yellow RoomWorking



Micro2 Lab
Anjum Ahmed
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
75
Hot wire CVD(HWCVD)
Slot size :30 min.
activation time : 15 min.
period of inactivity :700 days
Deposition, Growth and Annealing systemsgold contaminatedAnjum Ahmed
Swaroop GangulyMicro2 LabWorking
76
Organic Evaporation System
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsgold contaminatedTejas Naik
Anjum Ahmed
Dinesh KabraMicro2 LabWorking
77
4 probe Measurement (Automatic)
Slot size :10 min.
activation time : 5 min.
period of inactivity :100 days
Electrical characterizationlitho/analyticalAmbika Shanker Shukla
Anjum Ahmed
Swaroop GangulyMicro2 LabWorking
78
4 Probe Measurement (Manual)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Electrical characterizationlitho/analyticalAnjum Ahmed
Swaroop GangulyMicro2 LabWorking
79
DektakXT Profilometer
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationlitho/analyticalSangya Dutta
Anjum Ahmed
Saurabh LodhaMicro2 LabWorking
80
Filmetrics Reflectometer
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationtbdBhaskar Das
Anjum Ahmed
Udayan GangulyMicro2 LabWorking
81
Leica Microscope
Slot size :10 min.
activation time : 5 min.
period of inactivity :100 days
Material and structural characterizationcleanAnjum Ahmed
Micro2 LabWorking
82
X-ray Photoelectron Spectroscopy
Slot size :30 min.
activation time : 15 min.
period of inactivity :300 days
Material and structural characterizationlitho/analyticalAnjum Ahmed
Jayeeta Biswas (Sen)
Saurabh LodhaMicro2 LabPartially Working
83
Plasma Immersion Ion Implantation (PIII)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneoussemi clean bJayeeta Biswas (Sen)
Anjum Ahmed
Saurabh LodhaMicro2 LabWorking



Nano Lab
Neha Raorane, Pijush Chakraborty
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
84
ALD
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemssemi clean bNeha Raorane
Shraddha Kothari
Saurabh LodhaNano LabPartially Working
85
ALD LL
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemssemi clean bNeha Raorane
Shraddha Kothari
Saurabh LodhaNano LabWorking
86
Inductively coupled plasma CVD (ICPCVD)
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemssemi clean bNeha Raorane
Hitesh Kamble
Subhananda ChakrabartiNano LabWorking
87
Rapid Thermal Processing(RTP)
Slot size :10 min.
activation time : 5 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemsgold contaminatedAkhil Kumar S
Hitesh Kamble
Dipankar SahaNano LabWorking
88
Sputter (ATC 2200)
Slot size :30 min.
activation time : 15 min.
period of inactivity :60 days
Deposition, Growth and Annealing systemssemi clean bPijush Chakraborty
Pankaj Kumbhare
Udayan GangulyNano LabWorking
89
Sputter (Orion)
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemsgold contaminatedArnab Bose
Ashwin TulapurkarNano LabWorking
90
Ultech Furnace Anneal
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemscleanNeha Raorane
Satish Kothimbire
Anil KottantharayilNano LabWorking
91
Ultech Furnace Drive In
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemscleanSatish Kothimbire
Neha Raorane
Udayan GangulyNano LabWorking
92
Ultech Furnace Dry Oxide
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemscleanSatish Kothimbire
Neha Raorane
Anil KottantharayilNano LabWorking
93
Ultech Furnace i-poly
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemsgold contaminatedSatish Kothimbire
Neha Raorane
Udayan GangulyNano LabWorking
94
Ultech Furnace Low Temperature Oxide (LTO)
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemscleanCHANDAN JOISHI
Neha Raorane
Anil KottantharayilNano LabPartially Working
95
Ultech Furnace n-doped poly
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemscleanSatish Kothimbire
Neha Raorane
Anil KottantharayilNano LabPartially Working
96
Ultech Furnace Pyrogenic Oxide
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemscleanSatish Kothimbire
Neha Raorane
Subhananda ChakrabartiNano LabPartially Working
97
Ultech Furnace Silicon Nitride (SiN)
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemscleanNeha Raorane
Udayan GangulyNano LabWorking
98
Ultech Furnace Silicon Oxynitride (SiON)
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemscleanSatish Kothimbire
Neha Raorane
Anil KottantharayilNano LabWorking
99
Olympus Microscope
Slot size :10 min.
activation time : 5 min.
period of inactivity :20 days
Material and structural characterizationin line acNeha Raorane
Dipankar SahaNano LabWorking
100
Sentech Ellipsometer
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Material and structural characterizationin line acNeha Raorane
Nama Premsai
Saurabh LodhaNano LabWorking



Nano Litho Lab
Gayatri Vaidya, Hitesh Kamble
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
101
Double Sided Aligner (DSA)
Slot size :30 min.
activation time : 15 min.
period of inactivity :700 days
Lithographylitho/analyticalDipankar Biswas
Yogendra Yadav
Dipankar SahaNano Litho LabNot Working
102
RaithEBL_Short
Slot size :15 min.
activation time : 10 min.
period of inactivity :60 days
Lithographylitho/analyticalGayatri Vaidya
Mudassar Meer
Dipankar SahaNano Litho LabPartially Working
103
Spinner 4 inch (PMMA)
Slot size :15 min.
activation time : 5 min.
period of inactivity :100 days
Lithographylitho/analyticalHitesh Kamble
Gayatri Vaidya
Dipankar SahaNano Litho LabWorking
104
Spinner 8 inch (General Purpose)
Slot size :15 min.
activation time : 5 min.
period of inactivity :100 days
Lithographylitho/analyticalHitesh Kamble
Gayatri Vaidya
Dipankar SahaNano Litho LabWorking
105
Spinner 8 inch (PPR)
Slot size :15 min.
activation time : 5 min.
period of inactivity :100 days
Lithographylitho/analyticalHitesh Kamble
Gayatri Vaidya
Dipankar SahaNano Litho LabWorking
106
Torrey Pines Scientific Hi-temp Hotplate
Slot size :10 min.
activation time : 5 min.
period of inactivity :100 days
Miscellaneousgold contaminatedHitesh Kamble
Gayatri Vaidya
Nano Litho LabWorking
107
Torrey Pines Scientific Low-temp Hotplate
Slot size :10 min.
activation time : 5 min.
period of inactivity :100 days
Miscellaneousgold contaminatedHitesh Kamble
Gayatri Vaidya
Nano Litho LabWorking
108
Wafer bonder
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneousgold contaminatedNimisha Sreekumar
Gayatri Vaidya
Subhananda ChakrabartiNano Litho LabPartially Working



Nanoelectronics Processing Lab (NanoE bldg, 1st floor)
Manisha Bansode, Seeraz Nawaz
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
109
PLD I
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Deposition, Growth and Annealing systemsgold contaminatedManisha Bansode
SENTHILKUMAR R
Ashwin TulapurkarNanoelectronics Processing Lab (NanoE bldg, 1st floor)Working
110
PLD II
Slot size :60 min.
activation time : 30 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemscleanVarun Kumar Kushwaha
Manisha Bansode
Ashwin TulapurkarNanoelectronics Processing Lab (NanoE bldg, 1st floor)Working
111
Ambios XP-2 Profilometer
Slot size :10 min.
activation time : 5 min.
period of inactivity :90 days
Material and structural characterizationlitho/analyticalAnjum Ahmed
Manisha Bansode
Dipankar SahaNanoelectronics Processing Lab (NanoE bldg, 1st floor)Working
112
Ar-ion Milling
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Reactive Ion Etchgold contaminatedHanuman Singh
Ashwin TulapurkarNanoelectronics Processing Lab (NanoE bldg, 1st floor)Working
113
ICPRIE (old)
Slot size :30 min.
activation time : 15 min.
period of inactivity :700 days
Reactive Ion EtchcleanMudassar Meer
Yogendra Yadav
Dipankar SahaNanoelectronics Processing Lab (NanoE bldg, 1st floor)Working
114
Plasma asher
Slot size :30 min.
activation time : 15 min.
period of inactivity :90 days
Reactive Ion Etchgold contaminatedManisha Bansode
JASWANT RATHORE
Saurabh LodhaNanoelectronics Processing Lab (NanoE bldg, 1st floor)Partially Working



NCPRE Char lab (NanoE bldg, 3rd floor)
Diksha Makwani, Guru Burkul
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
115
CoRRescan
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Electrical characterizationsemi-clean pvGuru Burkul
Vishnu Kant Bajpai
Chetan SolankiNCPRE Char lab (NanoE bldg, 3rd floor)Working
116
In House Solar Simulator
Slot size :30 min.
activation time : 15 min.
period of inactivity :80 days
Electrical characterizationlitho/analyticalGuru Burkul
Anil KottantharayilNCPRE Char lab (NanoE bldg, 3rd floor)Working
117
Quantum Efficiency Measurement System
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Electrical characterizationlitho/analyticalSaima Cherukat
Raja Sekhar Baddula
KL NarasimhanNCPRE Char lab (NanoE bldg, 3rd floor)Working
118
SAN Four Probe System
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Electrical characterizationlitho/analyticalGuru Burkul
Anil KottantharayilNCPRE Char lab (NanoE bldg, 3rd floor)Working
119
Solar Cell I-V Measurement System
Slot size :30 min.
activation time : 15 min.
period of inactivity :50 days
Electrical characterizationlitho/analyticalGuru Burkul
Tarun Singh Yadav
Chetan SolankiNCPRE Char lab (NanoE bldg, 3rd floor)Working
120
Adhesion tester
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationsemi-clean pvVishnu Kant Bajpai
Chetan SolankiNCPRE Char lab (NanoE bldg, 3rd floor)Working
121
Lifetime Characterization and Suns Voc Measurement System
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Material and structural characterizationlitho/analyticalsuren patwardhan
Swasti Bhatia
Brij AroraNCPRE Char lab (NanoE bldg, 3rd floor)Working
122
Zeta 3D Microscope
Slot size :30 min.
activation time : 15 min.
period of inactivity :70 days
Material and structural characterizationlitho/analyticalGuru Burkul
Irfan Khorakiwala
Chetan SolankiNCPRE Char lab (NanoE bldg, 3rd floor)Working
123
Laser Doping System
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneoussemi-clean pvSwasti Bhatia
Vishnu Kant Bajpai
Chetan SolankiNCPRE Char lab (NanoE bldg, 3rd floor)Working
124
UV exposure system
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneouslitho/analyticalGuru Burkul
Diksha Makwani
Anil KottantharayilNCPRE Char lab (NanoE bldg, 3rd floor)Working



NCPRE Fab lab (NanoE bldg, 2nd floor)
Diksha Makwani, Sandeep Kumbhar
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
125
Contamination Study Furnace
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemssemi-clean pvAmruta Joshi
Diksha Makwani
Chetan SolankiNCPRE Fab lab (NanoE bldg, 2nd floor)Working
126
Diffusion Furnace
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemsclean pvDiksha Makwani
Sandeep Kumbhar
Anil KottantharayilNCPRE Fab lab (NanoE bldg, 2nd floor)Working
127
Plasma Enhanced Chemical Vapor Deposition (PECVD)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemssemi-clean pvSandeep Kumbhar
Tarun Singh Yadav
Anil KottantharayilNCPRE Fab lab (NanoE bldg, 2nd floor)Working
128
Edge Isolation Tool
Slot size :30 min.
activation time : 15 min.
period of inactivity :365 days
Reactive Ion Etchsemi-clean pvPadmanabhan Pradeep
Anil KottantharayilNCPRE Fab lab (NanoE bldg, 2nd floor)Working
129
Screen Printer
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Miscellaneoussemi-clean pvPadmanabhan Pradeep
Sandeep Kumbhar
Chetan SolankiNCPRE Fab lab (NanoE bldg, 2nd floor)Working



Organic electronics lab, EE annex
Naresh Kumar Kumawat
Serial
No.
System Name System detail Type Category System
Owner
Faculty
in-charge
Location System Status
(OK or Not OK)
130
Glove Box-2 with Evaporator (Inert atmosphere)
Slot size :30 min.
activation time : 15 min.
period of inactivity :30 days
Deposition, Growth and Annealing systemsgold contaminatedNaresh Kumar Kumawat
Dinesh KabraOrganic electronics lab, EE annexWorking
131
LAF (spincoater)
Slot size :30 min.
activation time : 15 min.
period of inactivity :100 days
Deposition, Growth and Annealing systemstbdNaresh Kumar Kumawat
Minita Surwade
Dinesh KabraOrganic electronics lab, EE annexWorking
132
Glove Box-2 with Semi Probe (Inert atmosphere)
Slot size :30 min.
activation time : 15 min.
period of inactivity :30 days
Electrical characterizationtbdKalyani Patrikar
Naresh Kumar Kumawat
Dinesh KabraOrganic electronics lab, EE annexWorking
133
Glove Box-1 with Spincoater and Hot Plates(Inert atmosphere)
Slot size :30 min.
activation time : 15 min.
period of inactivity :30 days
MiscellaneoustbdNakul Jain
KUNAL BORSE
Dinesh KabraOrganic electronics lab, EE annexWorking


Status SymbolMeaning of Status Symbol
Not WorkingEquipment may not be used
Partially WorkingEquipment working with some minor problem****
Fully Workingfully operational


****
          Definition of 'Controlled access' for Equipment in labs at IITBNF:
  • not open for training.
  • will be available for usage only through operators.
  • will be available for a fixed time period in a week as per the decision taken by the Faculty in charge of the tool.

This is to ensure that these critical equipment are used on a priority basis for processing jobs which are part of Project deliverables and then made available to other users.
Released on 08-09-2017 Version 4.0

Follow us on

Copyright ©2009 All Rights Reserved.